Ulaanbaatar Mineral processing workshop Steel Structure Project

Project Overview

two-span workshop 24 m × 2, eaves 14 m, area 12,800 m², ~1,420 t steel. Heavy floor loading for crushers and ball mills, 1×20 t crane, cold-formed Z-purlins, shot-blasted Sa 2.5 surface prep.

Ulaanbaatar Mineral processing workshop Steel Structure Project — representative project image
Representative image for this project type; actual project appearance may differ.

Technical Specifications

Why Choose WZH

WZH Construction Group delivered this industrial project in Ulaanbaatar, Mongolia with in-house shop-drawing detailing, factory fabrication, surface treatment and delivery (approx. 1420 tons of steel), supplied to the client's drawings and schedule.

Frequently Asked Questions

What is the typical delivery time?
Standard steel structure projects take 30-90 days, depending on design complexity, tonnage, and surface treatment requirements.
Do you provide design services?
Yes, we hold Class A steel structure design qualification and provide full BIM services (Tekla Structures) from concept to detail design.
How is quality assured?
Full ISO 9001 quality management. Welding per AWS D1.1/EN 1090. 100% NDT inspection on critical joints.

Get a Free Quote

Phone: +86 186 1064 8788 | Email: vip@wzhjt.com | WhatsApp: 8618610648788

Get a Free Quote | View All Projects

Related Projects