Harbin Metro Line 3 Rolling Stock Depot

Project Overview

Harbin Metro Line 3 depot, 437,000㎡, 10m height, cross column/H-beam with 9,100 tons of steel. The largest transit steel project by WZH.

Harbin Metro Line 3 Rolling Stock Depot — representative project image
Representative image for this project type; actual project appearance may differ.

Technical Specifications

Why Choose WZH

WZH Construction Group delivered this transportation facility project in Harbin, Heilongjiang Province with in-house shop-drawing detailing, factory fabrication, surface treatment and delivery (approx. 9100 tons of steel), supplied to the client's drawings and schedule.

Frequently Asked Questions

What is the typical delivery time?
Standard steel structure projects take 30-90 days, depending on design complexity, tonnage, and surface treatment requirements.
Do you provide design services?
Yes, we hold Class A steel structure design qualification and provide full BIM services (Tekla Structures) from concept to detail design.
How is quality assured?
Full ISO 9001 quality management. Welding per AWS D1.1/EN 1090. 100% NDT inspection on critical joints.

Get a Free Quote

Phone: +86 186 1064 8788 | Email: vip@wzhjt.com | WhatsApp: 8618610648788

Get a Free Quote | View All Projects

Related Projects