The solution starts with the building use and site design basis. A quotation review needs the overall dimensions, clear span and column spacing, eave height, doors and openings, crane or equipment requirements, local snow, wind and seismic loads, and the delivery destination. The agreed scope may include structural calculations and drawings, frame fabrication, roof and wall systems, export packing, logistics coordination and erection supervision. The proposal for each project defines the exact supply scope, responsibilities and document package. The ranges in the specification table are typical industry references. Final member sizes, connections, coatings, envelope system, schedule and order volume are determined after the input data are reviewed and are confirmed with the project quotation.
WZH designs and manufactures prefabricated steel warehouses, hangars and industrial buildings, with direct supply from its factory in China to Russia and the CIS. The agreed project scope can cover design, fabrication, delivery and erection supervision.
Typical Specifications
- Clear span: 12–36 m typical range; other spans are custom-engineered to order.
- Design loads: To local codes and site design data; values are confirmed before analysis.
- Column spacing: 6–9 m typical range; adjusted to layout, loads and equipment.
- Structural system: Portal-frame or framed system; the final system is selected by project analysis.
- Roof and wall system: Profiled sheet or sandwich panels; type, thickness and details are project-specific.
Frequently Asked Questions
- Can you deliver to Russia and the CIS?
- Yes. The route and transport mode are selected for the destination and project; rail logistics can be considered where the route supports it.
- Can the project be supplied as a turnkey package?
- Yes, within an agreed scope covering design, fabrication, delivery and erection supervision. The exact scope and responsibilities are defined for the project.
- How is the schedule determined?
- The schedule is project-specific and is confirmed with the quotation after the input data and supply scope have been reviewed.
- How is the order volume determined?
- The order volume and supply composition are determined for the project and confirmed during the quotation request.