A cold-storage project starts with the storage regime, not only the building dimensions. A quotation review needs the operating and design temperatures, humidity, chamber zoning, door-opening pattern, stored product, dimensions, floor loads, site snow and wind data, and delivery destination. The frame, insulated sandwich-panel envelope, vapour-control layer, joints, interfaces, doors, roof drainage and thermal-bridge treatment should be reviewed as one system. Core type and panel thickness are selected from the thermal calculation, project requirements and confirmed data for the selected panel system. The agreed scope may include design, steel-frame fabrication, envelope supply, export packing, delivery and erection supervision. Refrigeration equipment, insulated floor, foundations, internal services and commissioning are not included unless the proposal states them explicitly. Schedule and order volume are project-specific and are confirmed with the quotation request.
Design and fabrication of steel cold-storage warehouses and low-temperature buildings for severe-climate regions, with direct supply to Russia and the CIS.
Typical Specifications
- Clear span: 12–36 m typical industry range; other spans are custom-engineered after project analysis.
- Snow load: To local codes and site data; the design value is confirmed before engineering.
- Operating temperature: The temperature regime is project-specific and based on product, zoning and operating conditions.
- Column spacing: 6–9 m typical range; spacing is adjusted to chamber layout, loads and equipment.
- Insulation system: Mineral-wool or PU sandwich panels; core, thickness and details are selected for the project.
Frequently Asked Questions
- Can the cold-storage building be delivered to Russia and the CIS?
- Yes. Route, packing and transport mode are agreed for the destination and supply scope; rail can be considered where a suitable route is available.
- Can the cold store be supplied as a turnkey package?
- Yes, within an agreed scope covering design, frame, envelope, delivery and erection supervision. Refrigeration equipment, floor and services are included only when explicitly stated.
- How is the temperature regime determined?
- It is defined from the stored product, operating temperature, humidity, zoning and operating pattern, then confirmed by project analysis.
- How is the order volume determined?
- The order volume and supply composition are project-specific and are confirmed with the quotation request.